    Data Center MCHManor Coach House

    Aldershot, Hampshire

    CatN own and operate our own tier 2 compliant Data Centre in Aldershot. By owning and controlling our own Data Centre we have been able to design it to be state-of-the-art as well as flexible to our needs.

    • N+1 Un-interruptible Power Supply (UPS) with battery back-up.
    • 21 CCTV cameras cover all aspects of our Data Centre and offices.
    • Automated lighting ensures video capture in the event of a break-in.
    • UPS and Generator linked for redundancy in the event of mains power outage.
    Code
    MCH
    Label
    Aldershot
    LatLng
    51.24240744524371, -0.7545027136802673

    Data Centre WOKDigital Realty

    Woking, Surrey

    CatN has a point of presence in the state-of-the art Digital Realty facility in Woking which is Tier 3+ compliant. The facility boasts dual-power in each rack, fully redundant power supply, generation, cooling, UPS and network and achieves 99.98% uptime.

    • Mains power supplied via 2 x 132kV incomers 84MVA.
    • Proximity cards to authorise access levels including mantrap access.
    • Minimum N+N Un-interruptible Power Supply (UPS) with battery back-up.
    • Array of highly sensitive and redundant fire detection sensors to respond to even the slightest trace of smoke.
    Code
    WOK
    Label
    Woking
    LatLng
    51.32378,-0.587963

    thnTelehouse North

    Docklands, London

    CatN has a point of presence in Telehouse North in the heart of London Docklands. The facility has 24/7 onsite security, intruder sensing perimeter fencing, dual separate grid feeds and fully redundant UPS and cooling. Telehouse UK are highly environmentally accredited, holding current ISO 14001 and Carbon Trust standards.

    • 2 stage fire detection system that monitors the under floor, room and ceiling void space.
    • 24/7 On-site security with CCTV covering the perimeter, common areas and facilities management.
    • 6 independent 11kv three phase electrical supplies are provided from 3 separate substations.